
An unexploded ordnance (UXO) survey campaign has commenced at Ocean Winds’ 390 MW BC-Wind offshore wind farm site in Poland. The aim of the work is to ensure safety during the future installation of transmission cables connecting the BC-Wind offshore wind farm with the mainland. Thanks to these test

A nearshore geophysical survey and a drop-down video survey are starting this month at the two Norfolk Vanguard offshore wind sites, located 50 to 80 kilometers off the coast of Norfolk in the UK, where RWE plans to build offshore wind farms with an installed capacity of 1.4 GW each. The environment