
CTCI Machinery Corporation (CTCI MAC) has completed the first transition pieces ready to be loaded out for the Yunlin offshore wind project in Taiwan. The first batch of transition pieces will be loaded out on a barge by wpd in early August from CTCI MAC’s Ta-Lin Shop in Kaohsiung to the offshore si

Blue Offshore’s double basket carrousel barge, CC Atlantique, has arrived in Rotterdam, The Netherlands, carrying more than 8000 tonnes of high voltage cable for the connection of TenneT’s Hollandse Kust (zuid) Alpha Platform to the onshore grid. According to the company, this represents cable trans

Ørsted plans to officially commission the 752 MW Borssele 1 and 2 wind farm in the Dutch North Sea on 5 October, barring any negative effects from the COVID-19 pandemic. The wind farm comprises 94 Siemens Gamesa’s wind turbines, over two-thirds of which have now been installed at the site located 22

The offshore wind farms that won the Contracts for Difference (CfDs) in the latest UK CfD round will most likely be the first to operate with “negative subsidies”, even before the zero-subsidy projects awarded in auctions in the Netherlands and Germany. According to an analysis by an international t

The boulder picking operations have begun at the export cable route of the Moray East offshore wind project in Scotland. The boulder picking work started on 24 July using Olympic Triton, while the export cable laying and trenching operations are set to begin circa 28 July. NKT Victoria will be layin

Fugro has began the geophysical survey phase of a multidisciplinary site investigation contract worth around GBP 55 million for ScottishPower Renewables’ (SPR’s) East Anglia Hub project. The phased site investigations are scheduled to finish at the end of 2021 and support the development of wind far

Xodus Group has established a partnership with Japanese consultancy E&E Solutions to deliver advice and analysis for the offshore wind market in Japan. The partnership will provide integrated advisory and technical services for offshore wind developers, owners, operators and lenders. Xodus expects t

PDE Offshore has selected Sonardyne underwater positioning equipment to support its work on wind farm construction projects offshore Taiwan. The company has ordered a Mini-Ranger 2 Ultra-Short BaseLine (USBL) system and Wideband Sub-Mini 6+ (WSM 6+) transponder/responders. to accurately track the po

Following the release of G+ Offshore Wind Health and Safety Association’s 2019 statistics, Dropsafe has called for a more systematic approach to tackling dropped object incidents (drops) throughout the supply chain. According to the G+ report, there was a 44 per cent increase compared to 2018, howev

The 714 MW East Anglia One offshore wind farm has completed the final commissioning, with all 102 Siemens Gamesa 7 MW turbines now operational. Around 20% of the turbine installation and around half the turbine connection work was completed during the lockdown, ScottishPower Renewables said. Accordi

German offshore wind farms produced 13.73 terawatt hours (TWh) in the first half of 2020, almost 18 per cent more than in the same period last year (11.64 TWh). Of this, TenneT transmitted 11.51 TWh of offshore wind energy from the North Sea to the onshore grid, marking a 21.1 per cent increase comp

Iv-Offshore & Energy has signed the early works contract with Sembcorp Marine for the engineering of the Sofia high voltage direct current (HVDC) platform. As previously reported, GE Renewable Energy’s Grid Solutions and Sembcorp Marine will provide the electrical transmission system for RWE’s 1.4 G

Swedish energy company Vattenfall has issued a call for the supply of all required work to manufacture up to 50 monopile foundations for two nearshore wind projects in the Danish North Sea. The tender is divided into two lots. Lot 1 covers the civil engineering manufacturing of up to 50 transition p

The 25 MW WindFloat Atlantic floating offshore wind farm is now fully operational and supplying electricity to Portugal’s electrical grid. The WindFloat Atlantic project features three MHI Vestas 8.4 MW turbines mounted on Principle Power’s semi-submersible floating foundations. Following the connec