MBARI’s seafloor mapping robot has had a busy year. It documented a huge lava flow from a three-month-old volcanic eruption off the Oregon coast; it charted mysterious three-kilometer-wide scour marks on the seafloor off Northern California; and it unearthed data that challenge existing theories abo
Blue Offshore, a specialist subsea construction contractor, have announced that they have reached agreement to use the former Swan Hunter shipyard facilities at Wallsend, Newcastle-upon-Tyne (UK), for assembly and construction of their cable installation system. Blue Offshore will operate the facili
Danny Murray has been appointed to the newly created position of business development manager for the Middle East and North Africa. This move comes as TWMA announces its plans to set up a base in Dubai as part of its continuing growth strategy. Mr Murray joins the team at TWMA with over 20 years exp
The Visund North investment decision means that the fast-track developments around the Visund field in the North Sea are a step nearer completion. It was decided in autumn 2010 to fast track the development of Visund North with production start-up scheduled for autumn 2013. The partners have now rea
Barnstaple and Aberdeen based J+S Limited has reported record results for the year ended 30 September 2011. Sales were up 27.7% on the prior year to just under £13.3m and operating profit increased by a massive 41% to just under £1.5m. Both the sales and the operating profit hit record levels. Comme
Searcher Seismic Pty Ltd announces the commencement of acquisition of the Pala Sulu Non-Exclusive 2D Seismic Survey in the Philippines (project partner Seabird Exploration) in cooperation with the Philippines Department of Energy. This survey comprises 7,086km and covers the Palawan, Mindoro-Cuyo, S
Brazilian prosecutors are probing the possible involvement of state-led oil company Petrobras in a November offshore oil spill in a field… Reuters [mappress] Source: Reuters , December 05, 2011; Image: Chevron
When the shell plating of a 300-meter bulker was indented over a length of 150 meters after a grounding in the Suez Canal, a large crack 1.5 meters long appeared, making it impossible for the vessel to sail any further. To close off the crack and allow the vessel to continue its route, Hydrex sent [
Brazil’s ministry of communications announced a new Brazilian submarine telecommunications cable network project, which will include a direct link to Angola through Cape Verde. State-owned telecommunications firm Telebrás prepared preliminary plans,which expect the cables to leave the Brazilian city
E. ON contracted Fugro Consult GmbH to run a geotechnical exploration for offshore wind farm “Arkona-Becken Südost”, which E.ON is planning in the Baltic Sea. Work which took place in the summer and early fall of this year , has now been completed in water depths of approximately 22 to 37 m. Fugro u
A coalition of Pacific Civil Society organizations has called for a slow down in authorization of deep seabed mining in the Pacific Region. Procedures taken by numerous governments to legitimize and fast-track experimental seabed mining exploration as a development opportunity caused concerns among
UK-based specialist pipe measurement technology company Optical Metrology Services (OMS) Ltd has successfully completed an on-site internal… SubseaUK [mappress] Source: SubseaUK , December 02, 2011; Image: OMS
Emerald Networks, Inc., a subsea cable system owner/operator that provides low latency transatlantic capacity to the wholesale market, announces that the Group is to install, for completion by the Spring of 2013, the highest capacity, low latency, transatlantic submarine cable system in order to mee
MEO Australia Limited advises that it has received formal notification from Eni Australia Ltd (Eni) that it has committed to the acquisition of the Blackwood 3D seismic survey. The notification received is in accordance with the NT/P68 Farm-in Agreement, detailed in MEO’s ASX and Media release of 18