Reportbuyer.com has published a new market research report: Wind Power in India, Market Outlook to 2025, 2013 Update – Capacity, Generation, Levelized Cost of Energy (LCOE), Investment Trends, Regulations and Company Profiles. Wind Power in India, Market Outlook to 2025, 2013 Update – Capacity, Gene
ERC Equipose (ERCE), the independent reservoir evaluation specialists, has largely completed its work ordered by Northern Petroleum Plc in November 2013 and has presented Northern with an interim report of its findings. The findings relate to a resources review of the two permits held by the Company
Triggered by a desire to introduce innovative solutions aimed at facilitating work and anticipating potential dangers to the environment, General Electric (GE), an American multinational conglomerate corporation, is working on implementing the known technology and knowledge in segments never conside
The Brazilian government is conducting a study on the exploration tempo for deepwater pre-salt development in order to be able to map the process and anticipate and meet the needs from various players, including that for subsea equipment, Marco Press news agency reports. Numerous foreign specialists
JX Nippon Oil & Gas Exploration Corporation announced that through Greenland Petroleum Exploration Co., Ltd. (GreenPeX), it was successful in the 2012/2013 Licensing Round in Greenland Sea Area, Greenland Self-Government, and won the two offshore exploration licenses, Block 9 and Block 14, in Kanuma
GICON is currently developing a load-bearing floating structure for offshore wind turbines, the GICON® SOF (Schwimmendes Offshore Fundament = German for ‘Floating Offshore Foundation’). A key development milestone was passed in February 2012 when wave and tow tests of a 1:25 scale model were conduct
As part of the Patrick Administration’s efforts to support the development of an offshore wind industry hub in Massachusetts, the Massachusetts Clean Energy Center (MassCEC) has announced the preliminary results of a multi-year study of marine wildlife and launched an effort to study the logistics o
Research and Markets has announced the addition of the “2013 Report on the International LiDAR Market – Includes Forecast to 2018” report to their offering. A typical LiDAR system consists of three major components: a laser sensor, a Global Positioning System (GPS) unit, and an inertial navigation u
The ‘Offshore Wind Infrastructure Application Lab’ (OWI-Lab), a R&D initiative, has been accepted as additional partner in European project WIFI JIP. The Joint Industry Project WIFI will investigate wave run-up on fixed foundations for offshore wind turbines by numerical modeling, model testing, off
Neart na Gaoithe Offshore Wind Limited will be deploying two metocean buoys at the National Renewable Energy Centre (Narec) Blyth. The buoys will be deployed within 565m of the location below to measure wind speed and direction and waves and currents. Both buoys will be deployed alongside each other
Two waverider buoys are deployed 9km off the north coast of Scotland at Farr Point to support the development of Pelamis wave power farm project. The buoys are 0.9m in diameter, yellow and fitted with a flashing light. They are moored by a slack line and can move in a 200m radius watch circle. The [
The managing director of the world’s leading marine energy test facility has been recognised for his outstanding contribution to the renewable energy industry at the Scottish Green Energy Awards, held on December 6. Neil Kermode, managing director of the European Marine Energy Centre (EMEC) in Orkne
A request for information from floating wind turbine makers was published online by the ecology, sustainable development and energy minister at the beginning of December. The aim is to define the technical and economic conditions for the development of this sector. A pre-commercial deployment of a f
A request for information from floating wind turbine makers was published online by the ecology, sustainable development and energy minister at the beginning of December. The aim is to define the technical and economic conditions for the development of this sector. A pre-commercial deployment of a f