Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Research & Development

Loading filters...
InfrastructureInnovationTechnologyCertification & ClassificationEnvironmentEquipmentRegulation & PolicyRules & RegulationVesselsAuthorities & GovernmentTransitionCollaborationVisionBusiness & FinanceBusiness Developments & ProjectsIT & SoftwareHuman CapitalAutomationMarket OutlooksOperations & MaintenanceOutlook & StrategyPorts & LogisticsStorageProject & Tenders
French trio aims to slash pipeline inspection costs
Research & Development

French trio aims to slash pipeline inspection costs

French tubular solutions specialist Vallourec is working with its compatriots Forssea Robotics and iXblue to develop a pipeline inspection solution combining subsea drones and the use of visual markers, removing the need for surface vessels. Traditionally, the inspection of subsea pipelines and stru

about 5 years ago
CTI-Maritec
Research & Development

CTI-Maritec gets DNV GL approval for ballast water testing

Classification society DNV GL has approved CTI-Maritec as a test facility capable of undertaking ballast water system commissioning tests in line with new ballast water rules set to enter-into-force in October 2021. The Approval of Service Supplier (AoSS) certification, the first of three classifica

about 5 years ago
IMO headquarters
Research & Development

Shipping needs to step up and introduce a carbon levy before EU does

With the EU advancing on its plans to include international shipping in its Emissions Trading System (ETS), the pressure is on for the international maritime industry to introduce a market-wide measure to pay for its share of emissions. Under the plan, the EU wants to include the maritime sector int

about 5 years ago
Sunlit Sea floating solar plant
Research & Development

Novacavi prototype for floating solar power plant

Italian cabling specialist Novacavi has recently developed and manufactured a prototype of a custom-engineered cable solution for an innovative floating solar electricity system for marine environment installed in Oslo fjord, Norway. Being challenged by its specific permanent application on top of f

about 5 years ago
Microsoft and C4IR Ocean join forces to save the ocean
Research & Development

Microsoft and C4IR Ocean join forces to save the ocean

The Center for the Fourth Industrial Revolution and the Ocean (C4IR Ocean) is working to promote a sustainable ocean and is partnering with Microsoft to develop technology-based solutions to improve ocean health. Aker and the World Economic Forum are behind C4IR Ocean, which is part of a global netw

about 5 years ago
Shell CEO Ben van Beurden
Research & Development

Shell teams up with Microsoft in push to lower carbon emissions

Oil major Shell and tech giant Microsoft are embarking on a new strategic alliance to support progress towards a world with net-zero emissions.

about 5 years ago
Supergen ORE Hub director joins Royal Academy of Engineering Fellowship
Research & Development

Supergen ORE Hub director joins Royal Academy of Engineering Fellowship

One of the UK’s leading offshore renewable energy academics has been admitted to the Fellowship of the Royal Academy of Engineering. Professor Deborah Greaves OBE has been working in the sector for more than two decades. She is currently director of the UK’s Supergen Offshore Renewable Energy (ORE)

about 5 years ago
Digital twin BP
Research & Development

BP rides the wave of digitalization with reduction in operating costs and revenue boost on the horizon

BP has been doing its part to unlock the value of technology and tap into its benefits. This has become especially noticeable during 2020 with plans to become a net-zero company by 2050.

about 5 years ago
Indonesia patent for GKinetic
Research & Development

Indonesia patent for GKinetic

Irish hydrokinetic turbine developer GKinetic Energy has successfully secured an Indonesian patent. GKinetic also has patents in Europe, Australia, China as well as the USA. It enables the company to enter key markets with viable tidal energy potential to further develop the technology. According to

about 5 years ago
Pieter Huyskens, R&D Manager at Damen
Research & Development

VIDEO: “The luxury of fossil fuels is over”

“We need to find the next solution after fossil fuels, luxury is over. We had a very high energy density in a very compact and rather cheap fuel, but we are running out of it. The marine sector is responsible for a huge amount of emissions CO2 and pollutants so it’s really necessary that we [&hellip

about 5 years ago
subsea compression system
Research & Development

From idea to reality: five years since the first subsea compression system

Five years after the kick off, the subsea compression system covering an area the size of a football field, at Equinor-operated Åsgard development in the Norwegian Sea, still runs like clockwork. The entire Åsgard field is one of the largest developments on the Norwegian continental shelf, embracing

about 5 years ago
Jonathan Fuller, Global Head of Advisory and Energy Transition at Xodus Group
Research & Development

Xodus delivers tariffs study for Dutch CCUS project

Engineering consultancy Xodus Group has delivered a review into tariffs for a landmark carbon capture utilisation and storage (CCUS) project in the Netherlands. The review for the Dutch Ministry of Economic Affairs and Climate Policy analysed proposed fees for the transport and storage requirements

about 5 years ago
Bombora mWave WEC
Research & Development

Bombora taps Kingswood Engineering for mWave intervention tool structure

Ocean energy solutions company Bombora has recently selected Kingswood Engineering for the fabrication of the intervention tool structure for the mWave wave energy converter demonstrator. The intervention tool structure is the floating structure which facilitates the subsea installation and removal

about 5 years ago
deployment at EMEC
Research & Development

EMEC rolls out IT support tender

The European Marine Energy Centre (EMEC) is seeking tenders for IT support for the entire organisation. A single-supplier framework agreement is for a period of 3 years and with the option of two one-year extensions. EMEC will keep the tender open until 16 October 2020. The IT support contract, valu

about 5 years ago
  • 1
  • …
  • 274
  • 275
  • 276
  • …
  • 1308