Offshore Energy
  • news
  • test
JobsNewsletter
Offshore Energy logo
Topics
  • News
  • Contracts & Tenders
  • Authorities & Government
  • Automation
  • Business & Finance
Network
  • Dredging Today
  • NavalToday
  • Offshore Energy
  • Offshore Wind
  • Maritieme Vacaturebank
Company
  • Advertising
  • Newsletter
  • Jobs

© 2026 Navingo. All rights reserved.

Storage

Loading filters...
Authorities & GovernmentBusiness & FinanceEnvironmentHuman CapitalOperations & MaintenanceProject & TendersResearch & DevelopmentTechnology
Offshore ReWIND: The Most Read News in 2016
Storage

Offshore ReWIND: The Most Read News in 2016

The Offshore WIND editorial staff wish our readers a happy and prosperous New Year! May it be at least as eventful for the offshore wind industry as 2016 was. To remind you of just how interesting 2016 was, we compiled a list of what was read the most throughout the year behind us. Oil & […]

about 9 years ago
Top News of 2016 – Editors’ Picks
Storage

Top News of 2016 – Editors’ Picks

The editorial team at Offshore WIND have compiled a list of what we thought were the most important developments within the offshore wind industry in 2016. Vattenfall Wins Kriegers Flak Tender with EUR 49.9 per MWh Bid Swedish energy company Vattenfall has won the tender to build the 600MW Kriegers

about 9 years ago
Top Offshore Wind Videos of 2016
Storage

Top Offshore Wind Videos of 2016

As 2016 drew to a close, we thought it might be a good idea to look back and see what was read and viewed the most in what was a momentous year for offshore wind. As per our tradition, at the end of each year we compile lists containing the most popular content in a number of categories, […]

about 9 years ago
Top News of the Week, 26-31 December 2016
Storage

Top News of the Week, 26-31 December 2016

GeoSea Installs First Foundation at Galloper Offshore marine engineering specialist GeoSea installed the first of fifty-six turbine foundations at the 336MW Galloper offshore wind farm on Wednesday, 28th December. Block Island Turbine Out of Action Until Second Half of February One of the General El

about 9 years ago
Top News of the Week, 26-31 December 2016
Storage

Top News of the Week, 26-31 December 2016

GeoSea Installs First Foundation at Galloper Offshore marine engineering specialist GeoSea installed the first of fifty-six turbine foundations at the 336MW Galloper offshore wind farm on Wednesday, 28th December. Block Island Turbine Out of Action Until Second Half of February One of the General El

about 9 years ago
VIDEO: Block Island Cable Installation
Storage

VIDEO: Block Island Cable Installation

Kokosing’s Durocher Marine Division installed six miles of subsea cables for America’s first offshore wind farm off Block Island, Rhode Island. All of the cables for the 30MW Block Island wind farm were installed by the end of July 2016. The wind farm came online on 12 December, feeding the first po

about 9 years ago
Hywind Buoyant on French Connection
Storage

Hywind Buoyant on French Connection

French cable maker Nexans has awarded its compatriot, Bardot Group, with a contract to supply buoyancy modules for the power cables of Hywind Scotland, the world’s first floating wind farm. The 30MW floating wind farm, located 30 kilometres off the coast of Peterhead, will be operated by Norwegian o

about 9 years ago
Block Island Turbine Out of Action Until Second Half of February
Storage

Block Island Turbine Out of Action Until Second Half of February

One of the General Elecetric’s (GE) Haliade turbines installed at America’s first offshore wind farm will be out of action at least until the second half of February, according to a statement issued by Block Island Wind Farm’s Fisheries Liaison, Elizabeth Ann Marchetti. The wind farm’s turbine numbe

about 9 years ago
Ramboll Wins Elia’s Offshore SwitchYard Platform Design Contract
Storage

Ramboll Wins Elia’s Offshore SwitchYard Platform Design Contract

Ramboll Danmark A/S has won a contract to provide a detailed design of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid project being developed by Belgian transmission system operator Elia. The OSY platform will be situated up to 45 kilometres off Belgian North Sea coast, in wate

about 9 years ago
Ramboll Wins Elia’s Offshore SwitchYard Platform Design Contract
Storage

Ramboll Wins Elia’s Offshore SwitchYard Platform Design Contract

Ramboll Danmark A/S has won a contract to provide a detailed design of the Offshore SwitchYard (OSY) platform for the Modular Offshore Grid project being developed by Belgian transmission system operator Elia. The OSY platform will be situated up to 45 kilometres off Belgian North Sea coast, in wate

about 9 years ago
Danes Developing Drone UXO Hunter
Storage

Danes Developing Drone UXO Hunter

Technical University of Denmark (DTU) has teamed up with compatriot drone company Sky-Watch to develop a drone with magnetometers capable of mapping mines in former war zones, which will initially be used to identify potential unexploded ordnance (UXO) along the power cable routes of future offshore

about 9 years ago
VIDEO: VBMS and Boskalis Getting Busy at Rampion
Storage

VIDEO: VBMS and Boskalis Getting Busy at Rampion

In December 2016, VBMS completed the installation of two 16 kilometre-long 150kV HVAC export cables for the Rampion offshore wind farm situated off the coast of Worthing, UK. To overcome some environmental challenges in this very shallow water, VBMS had to extend the pre-installed landfall HDD’s wit

about 9 years ago
Germany Smashes Offshore Wind Power Production Record
Storage

Germany Smashes Offshore Wind Power Production Record

German offshore wind farms are expected to generate 13 billion kWh of electricity in 2016, a 57 percent jump compared to 8.3 billion kWh generated by wind farms off Germany in 2015. The estimate was released by the country’s Federal Association for Energy and Water Management (BDEW) and the Center f

about 9 years ago
Energinet.dk Seeks Cable Burial & Protection Contractor for Kriegers Flak CGS
Storage

Energinet.dk Seeks Cable Burial & Protection Contractor for Kriegers Flak CGS

Energinet.dk has invited tenders for burial and protection of 150kV subsea cables at Kriegers Flak Combined Grid Solution (CGS). The works include burial and protection of approximately 2 x 24km of submarine cable route, which is to be divided into trenching and jetting work for the Krieger’s Flak C

about 9 years ago
  • 1
  • …
  • 106
  • 107
  • 108
  • …
  • 216