Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Storage

Loading filters...
Offshore WindOperations & MaintenanceWind FarmsAlternative FuelsFloating SolarOTECTidal & Wave EnergyBusiness & FinanceProject & TendersAuthorities & Government
TenneT Picks Jan De Nul for Cable Repairs Offshore Germany
Storage

TenneT Picks Jan De Nul for Cable Repairs Offshore Germany

Transmission system operator TenneT has awarded Jan De Nul with a framework agreement for repairs of TenneT’s offshore high-voltage cables in the German Bight. Under the terms of the agreement, Jan De Nul will mobilize in the event of high-voltage cable system faults or failures within the contractu

about 7 years ago
TenneT Picks Jan De Nul for Cable Repairs Offshore Germany
Storage

TenneT Picks Jan De Nul for Cable Repairs Offshore Germany

Transmission system operator TenneT has awarded Jan De Nul with a framework agreement for repairs of TenneT’s offshore high-voltage cables in the German Bight. Under the terms of the agreement, Jan De Nul will mobilize in the event of high-voltage cable system faults or failures within the contractu

about 7 years ago
Deutsche Bucht Substation Topside On the Move
Storage

Deutsche Bucht Substation Topside On the Move

The topside for the Deutsche Bucht substation was shipped out from the Damen Shiprepair yard in Vlissingen, the Netherlands, to the installation site in the German North Sea on 19 March. The 269MW Deutsche Bucht offshore wind farm will comprise of 33 MHI Vestas 8.4MW wind turbines installed on 31 mo

about 7 years ago
Highlights of the Week
Storage

Highlights of the Week

MarineEnergy.biz has compiled the top news from marine energy industry from March 18 – March 24, 2019. https://marineenergy.biz/2019/03/19/new-report-released-on-future-of-uk-tidal-and-wave-power/ https://marineenergy.biz/2019/03/20/megaroller-project-reaches-new-milestone/ https://marineenergy.biz/

about 7 years ago
First Triton Knoll Onshore Cables Roll Out
Storage

First Triton Knoll Onshore Cables Roll Out

The first onshore electrical cables destined for the Triton Knoll offshore wind farm have rolled out from production and are heading towards the Port of Boston, the UK. The High Voltage Alternating Current (HVAC) cables will make up the onshore cable network, connecting power from the 860MW offshore

about 7 years ago
First Triton Knoll Onshore Cables Roll Out
Storage

First Triton Knoll Onshore Cables Roll Out

The first onshore electrical cables destined for the Triton Knoll offshore wind farm have rolled out from production and are heading towards the Port of Boston, the UK. The High Voltage Alternating Current (HVAC) cables will make up the onshore cable network, connecting power from the 860MW offshore

about 7 years ago
Prysmian Wins French Floater Contract
Storage

Prysmian Wins French Floater Contract

Prysmian Group has won a contract to develop a turnkey cable system for the Provence Grand Large floating offshore wind project in France. Under the EUR 30 million deal, Prysmian will supply 3km of inter-array cables, 19km of export cables and onshore cables for a 9km route. All submarine cables wil

about 7 years ago
Anbaric Submits 1,200MW Massachusetts Interconnection Request
Storage

Anbaric Submits 1,200MW Massachusetts Interconnection Request

Anbaric has filed a request with ISO-New England for a 1,200MW HVDC interconnection to a substation in Brayton Point, Massachusetts, that would collect energy produced by offshore wind projects. According to Anbaric, the proposal will offer expanded wind generation procurements off Massachusetts res

about 7 years ago
Anbaric Submits 1,200MW Massachusetts Interconnection Request
Storage

Anbaric Submits 1,200MW Massachusetts Interconnection Request

Anbaric has filed a request with ISO-New England for a 1,200MW HVDC interconnection to a substation in Brayton Point, Massachusetts, that would collect energy produced by offshore wind projects. According to Anbaric, the proposal will offer expanded wind generation procurements off Massachusetts res

about 7 years ago
Polish Offshore Wind Farms Clear Another Hurdle
Storage

Polish Offshore Wind Farms Clear Another Hurdle

MFW Bałtyk III Sp. z o.o., a joint venture between Equinor and Polenergia S.A., has secured an environmental decision for the offshore grid infrastructure connecting two offshore wind farms with a total capacity of 1440MW to the Polish national grid system. The decision was issued by the Regional Di

about 7 years ago
Polish Offshore Wind Farms Clear Another Hurdle
Storage

Polish Offshore Wind Farms Clear Another Hurdle

MFW Bałtyk III Sp. z o.o., a joint venture between Equinor and Polenergia S.A., has secured an environmental decision for the offshore grid infrastructure connecting two offshore wind farms with a total capacity of 1440MW to the Polish national grid system. The decision was issued by the Regional Di

about 7 years ago
Ofgem Names Walney Extension OFTO
Storage

Ofgem Names Walney Extension OFTO

Ofgem has appointed Diamond Transmission Partners as the preferred bidder to own and operate the offshore transmission link of the Walney Extension offshore wind farm in the UK. The consortium of HICL Infrastructure Company, Diamond Transmission Corporation and Chubu Electric Power will be operating

about 7 years ago
Dutch Offshore Grid Connection Open for Comments
Storage

Dutch Offshore Grid Connection Open for Comments

TenneT and the Dutch Ministry of Economic Affairs and Climate Policy (EZK) are inviting the public to provide comments on the infrastructure for connecting the North of the Wadden Sea Islands offshore wind project to the grid. The parties said that by gathering feedback on the 700MW Ten Noorden van

about 7 years ago
Triton Knoll Electrical Work to Begin End of March
Storage

Triton Knoll Electrical Work to Begin End of March

The key works to connect the onshore and offshore electrical circuits of the Triton Knoll offshore wind project are set to start at the end of March, according to the project developer. The activities will take place at the project’s landfall location north of Anderby Creek, the UK, and will include

about 7 years ago
  • 1
  • …
  • 51
  • 52
  • 53
  • …
  • 216