
Nexans and Ulstein have held the grand block ceremony for the new cable-laying vessel (CLV) Nexans Electra, bringing the vessel closer to realization. The ceremony was celebrated on September 10 at CRIST, Poland, with the remaining processes such as engineering, outfitting, system integration, equip

SLB has inked a memorandum of understanding (MoU) with C-Power through its OneSubsea joint venture (JV) to, together with Subsea7, explore using ocean energy as a lower-cost, lower-carbon power source for subsea applications. SLB OneSubsea, the JV backed by SLB, Aker Solutions, and Subsea7, will pro