The Freeport liquefied natural gas terminal in Texas is to receive a cargo of the fuel December 19 from Trinidad and Tobago, according to vessel tracking data. The cargo is being hauled by British Sapphire, a 151,945 cubic-meter tanker. Freeport’s Texas facility has a peak send-out capacity of more
Mitsui O.S.K. Lines, Ltd. (MOL) today announced that the MOL-managed LNG carrier Al Zubarah and its ship management company MOL LNG Transport Co., Ltd., received a Green Award Certificate from the independent non-profit Green Award Foundation based in Rotterdam on December 13. The certificate, based
The Ejnan liquefied natural gas carrier, with a capacity of 145,000 cubic metres, is due to arrive in the Zeebrugge LNG terminal December 22, according to the Port of Zeebrugge website. The Zeebrugge LNG terminal is situated on a 30ha site in the outer port of Zeebrugge, Belgium. It is operated by F
Fairstar Heavy Transport N.V. (FAIR) has signed a Bridge Loan Facility Agreement with Bank of China. The facility provides financing of the third installment of the construction of the FORTE in accordance with the Terms of Payment in the Shipbuilding Contract. The Bridge Loan Facility will be repaid
The Al Aamriya LNG carrier, with a capacity of 210,168 cubic metres, is due to arrive in the UK’s Dragon terminal December 21, according to the Milford Haven Port Authority website. BG and Petronas between them have contracted for the full capacity at Dragon LNG’s Milford Haven site over the next 20
IHC Merwede has announced that it has recently secured orders for advanced vessels and equipment in its core markets of dredging and offshore to the value of €200million. The latest agreements confirmed by IHC Merwede include: a new pipelaying vessel for Subsea 7; an engineering and components packa
Portugal’s Port of Sines is scheduled to receive a shipment of LNG from Qatar on December 23, according to the Port of Sines website. The Lusail LNG Tanker, with a capacity of 145,000 cubic metres, is sailing from Port of Ras Laffan. The terminal is held by REN Atlântico and has a nominal send out [
IHC Merwede has been awarded a contract to deliver the environmentally friendly deep-water dredger, IHC Beaver® 4040, for Zhejiang Dredging (China). This innovative cutter suction dredger will be optimised to work on lake and reservoir dredging projects – and is unique in its class. Boundary breakin
Idreco has delivered its new ISD 350/30E dredger to Peene Kies. Peene Kies has already two ISD 350 dredgers from Idreco, with dredging depths till 20 meters. The new Type ISD 350/30E can dredge untill 32 meters deep and it is equipped with the newest IDRECO direct drive underwater engine with 450 kW
The latest LNG cargo to be loaded at Norway’s Hammerfest terminal has been dispatched to Spain, according to shipping data. The 140,000 m3 Arctic Voyager departed Hammerfest yesterday, and is expected to arrive at the Huelva terminal on December 20. The Hammerfest terminal, on the island of Melkøya,
Portugal’s Port of Sines is scheduled to receive a shipment of LNG from Nigeria on December 18, according to the Port of Sines website. The LNG Finima, with a capacity of 130,000 cubic metres, is sailing from Nigerian Bonny terminal. The terminal is held by REN Atlântico and has a nominal send out c
The Association for Corporate Growth (ACG) Maryland Chapter, the premier network for middle market deal makers, awarded the prestigious “Deal of the Year Award” to Ellicott Dredge Enterprises, LLC for its purchase of selected assets from Rohr Corporation. In March 2011 Ellicott Dredge Enterprises, L
The Mantiwoc, a ship carrying limestone, ran aground in Saint Joseph this week. Being unable to get into the harbor, the ship had no other choice but to go back 300 to 500 feet off from Dock 63. This happened at the same time as the State Senate was considering a resolution cosponsored by John [&hel
The 350-foot-long tourist landmark on Lake Kalamazoo, S.S. Keewatin steamship will be set free once 50,000 cubic yards of the muck and mud are removed this week. The Keewatin is surrounded by approximately 12 feet of silt and dredging the muck is the first step to getting the ship ready to cover a 6