The cable laying vessel Stemat Spirit is being loaded with the first batch of inter-array cables for the Galloper offshore wind farm at JDR Cables’ facility in Hartlepool.
North Yorkshire-based Specialist Marine Consultants has won a contract to provide client representatives to monitor turbine installation and inter-array cable installation works on DONG Energy’s 573MW Race Bank offshore wind farm off North Norfolk.
North Yorkshire-based Specialist Marine Consultants has won a contract to provide client representatives to monitor turbine installation and inter-array cable installation works on DONG Energy’s 573MW Race Bank offshore wind farm off North Norfolk.
The last four transition pieces (TPs) for the Galloper offshore wind farm in the UK have been dispatched from Smulders facilities in Hoboken, Belgium, and are on their way to Rotterdam, where they will be loaded onto the installation vessel Innovation at Sif’s Maasvlakte 2 site.
Lincolnshire design consultancy Land Drainage Services Ltd (LDS) has been awarded a contract extension by Triton Knoll Offshore Wind Farm to provide a long-term liaison service between the project and its local landowners.
Lincolnshire design consultancy Land Drainage Services Ltd (LDS) has been awarded a contract extension by Triton Knoll Offshore Wind Farm to provide a long-term liaison service between the project and its local landowners.
Ecology specialists from Royal Haskoning DHV will for the next two weeks survey vegetation and wildlife habitats at parts of the onshore export cable corridor for the 900MW Triton Knoll offshore wind farm.
Iberdrola has opened the Operation & Maintenance (O&M) building for the 350MW Wikinger offshore wind farm in the Mukran Port.
Scottish energy company SSE and Norway’s Statoil have increased their share in the Dogger Bank offshore wind development after the companies acquired and equally divided a 25% stake from former consortium partner Statkraft.
France will start the first phase of the competitive dialogue procedure for the offshore wind area off Oléron in the Atlantic in the following months as part of the country’s Round 3 tender.
The offshore wind project developed by the Iberdrola-led Ailes Marines consortium in the Bay of Saint-Brieuc, France, is set to receive the administrative authorisation in the coming days, according to French Ministry of the Environment, Energy and the Sea.
Houlder’s Advanced Analysis Group has provided Siemens Wind Power with a bespoke 3D-visualisation software tool to model project logistics and optimise the turbine installation process at DONG Energy’s 660MW Walney Extension offshore wind farm.
An arbitration tribunal has ruled in favour of Mainstream Renewable Power in relation to the dispute over the Low Carbon Contracts Company (LCCC) terminating the Contract for Difference (CfD) for Mainstream’s 450MW Neart na Gaoithe wind farm off Scotland.
Good Energy Group has signed an agreement with DONG Energy which will see the Chippenham-based renewable electricity supplier and generator source offshore wind power for its customers for the first time.