Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
StorageBusiness & FinanceTechnologyNewsAuthorities & GovernmentEnvironmentHuman CapitalOperations & MaintenanceResearch & Development
Rough Seas Delay Block Island Subsea Cable Installation
Wind Farms

Rough Seas Delay Block Island Subsea Cable Installation

Adverse sea conditions have pushed back the installation of the 20-mile National Grid submarine cable from Narragansett, Rhode Island, to Block Island by one week. The cable laying barge Big Max was initially scheduled to install the cable last week, however, rough sea conditions postponed the works

about 10 years ago
Five Beefed Up MHI Vestas Giants Heading to Blyth
Wind Farms

Five Beefed Up MHI Vestas Giants Heading to Blyth

MHI Vestas Offshore Wind has received an order from EDF Energy Renewables for five V164-8.0 MW turbines to be installed at the 41.5 MW Blyth Offshore Demonstrator Project. The V164-8.0 MW turbines – rated with a capacity of 8MW – have been optimised for the project, utilising a power mode to be able

about 10 years ago
Five Beefed Up MHI Vestas Giants Heading to Blyth
Wind Farms

Five Beefed Up MHI Vestas Giants Heading to Blyth

MHI Vestas Offshore Wind has received an order from EDF Energy Renewables for five V164-8.0 MW turbines to be installed at the 41.5 MW Blyth Offshore Demonstrator Project. The V164-8.0 MW turbines – rated with a capacity of 8MW – have been optimised for the project, utilising a power mode to be able

about 10 years ago
EDF Decides to Build Blyth Offshore Wind Farm
Wind Farms

EDF Decides to Build Blyth Offshore Wind Farm

EDF Energy Renewables will build a new offshore wind farm off the coast of Blyth in Northumberland. Onshore construction work has already begun and offshore work will start in 2017. The wind farm will comprise five turbines, totaling 41.5MW in capacity. The project has permission for a maximum total

about 10 years ago
Kentish Flats Extension Becomes Fully Fledged Offshore Wind Farm
Wind Farms

Kentish Flats Extension Becomes Fully Fledged Offshore Wind Farm

The official inauguration of Vattenfall’s Kentish Flats Extension (KFE) offshore wind farm is being held today, with the ceremonial ribbon cut on board the MV Balmoral, 7km off Herne Bay and Whitstable. Vattenfall is ahead on the low cost energy challenge, according to Gunnar Groebler, Vattenfall’s

about 10 years ago
Kentish Flats Extension Becomes Fully Fledged Offshore Wind Farm
Wind Farms

Kentish Flats Extension Becomes Fully Fledged Offshore Wind Farm

The official inauguration of Vattenfall’s Kentish Flats Extension (KFE) offshore wind farm is being held today, with the ceremonial ribbon cut on board the MV Balmoral, 7km off Herne Bay and Whitstable. Vattenfall is ahead on the low cost energy challenge, according to Gunnar Groebler, Vattenfall’s

about 10 years ago
JD Contractor Starts Laying Horns Rev C Subsea Cable
Wind Farms

JD Contractor Starts Laying Horns Rev C Subsea Cable

Danish national transmission system operator Energinet.dk has started works to install a 33-kilometre subsea cable which will connect the offshore substation at the 400MW Horns Rev 3 offshore wind farm to the power grid on land. JD Contractor’s multipurpose offshore installation vessel Sima will ins

about 10 years ago
Photo of the Day: Action at Tahkoluoto Offshore Wind Farm
Wind Farms

Photo of the Day: Action at Tahkoluoto Offshore Wind Farm

Dredger Mimar Sinan and the split hopper barge Tiger have started work at the Tahkoluoto offshore wind farm site. The vessels are working on dredging and excavation for foundations and cable ditches. The underground cable and substation will be installed by the next summer, with foundations and subs

about 10 years ago
Dudgeon Halfway Done
Wind Farms

Dudgeon Halfway Done

Installation works on the 402MW Dudgeon offshore wind farm are progressing according to plan and the project is halfway to being completed, according to Dudgeon Offshore Windfarm Limited (DOWL). The wind farm’s export cables were laid and the jacket for the offshore substation was installed in May.

about 10 years ago
Hollandia Offshore Pens Kriegers Flak Substations Fabrication Contract
Wind Farms

Hollandia Offshore Pens Kriegers Flak Substations Fabrication Contract

Hollandia Offshore B.V. and the Danish transmission system operator, Energinet.dk, signed a contract for the engineering, procurement and commissioning of the Kriegers Flak substations on 31 May. The project comprises two unmanned substations which are due for delivery to the installation site in Ap

about 10 years ago
Highlights of the Month: May 2016
Wind Farms

Highlights of the Month: May 2016

Shell Setting Up ‘New Energies’ Unit. Oil & Gas Companies to Cause Clash of Giants in Offshore Wind? Shell has created a new division called New Energies, through which the oil and gas giant will invest in wind energy, along with its hydrogen, biofuels and electrical activities, according to The Gua

about 10 years ago
Burbo Bank Extension Topside Meets Jacket (Gallery)
Wind Farms

Burbo Bank Extension Topside Meets Jacket (Gallery)

Engie Fabricom and Iemants completed the load-out of the topside for the 258MW Burbo Bank Extension offshore wind farm at the ENGIE Fabricom’s Hoboken yard on 30 May. The 1180-tonne topside was placed next to the 985-tonne offshore substation jacket on the pontoon. The jacket was loaded onto the pon

about 10 years ago
Vattenfall Ready to Build Danish Record-Breaker
Wind Farms

Vattenfall Ready to Build Danish Record-Breaker

Swedish state-owned energy company Vattenfall is about to start the construction of the 400MW Horns Rev 3 offshore wind farm off the west coast of Denmark, which once commissioned in 2018 will be the largest offshore wind farm in Danish waters. The total investment into the project will be just over

about 10 years ago
Laying of Block Island Mainland Link to Start This Week
Wind Farms

Laying of Block Island Mainland Link to Start This Week

The Big Max cable laying barge will start installing the 20-mile submarine cable which will export the electricity produced by the the first US offshore wind farm, the 30MW Block Island, to the mainland later this week. The National Grid (Sea2Shore) subsea cable will connect Block Island, to Naragan

about 10 years ago
  • 1
  • …
  • 373
  • 374
  • 375
  • …
  • 508