Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo
Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Wind Farms

Loading filters...
Operations & MaintenanceNewsResearch & DevelopmentBusiness & FinanceStorageEnvironment
Busy Summer at Gwynt y Môr Offshore Wind Farm
Wind Farms

Busy Summer at Gwynt y Môr Offshore Wind Farm

Works at the Gwynt y Môr Offshore Wind Farm are in full swing, as several vessels are currently carrying out their job. The cable maintenance vessel Ndurance is expected to start operations at the Gwynt y Môr offshore wind farm today (June 10). Ndurance will work for six weeks in the eastern part of

about 12 years ago
First TP Installed at Butendiek Offshore Wind Farm
Wind Farms

First TP Installed at Butendiek Offshore Wind Farm

The first of a total of 80 transition pieces (TP) at the Butendiek offshore wind farm has been installed. Transition pieces, manufactured by Bladt Industries in Esbjerg, Denmark, are being installed by the DP heavy-lift vessel Jumbo Javelin from Jumbo Shipping. Each TP weighs approximately 330 tons,

about 12 years ago
Offshore Monitoring Services Required for Sandbank OWF
Wind Farms

Offshore Monitoring Services Required for Sandbank OWF

Sandbank Offshore Wind GmbH has invited tenders for offshore monitoring work. The work involves monitoring the condition of foundations in the Sandbank offshore wind farm. The foundation monitoring concept is based on online monitoring of two representative wind turbine foundations. The online monit

about 12 years ago
VIDEO: Opportunities for Local Businesses in Moray Offshore Wind Project
Wind Farms

VIDEO: Opportunities for Local Businesses in Moray Offshore Wind Project

On May 8, one of three offshore wind supply chain workshops for the Moray offshore wind farm was held. The workshops are organized by Scottish Enterprise and Highlands and Islands Enterprise on behalf of Moray Offshore Wind Limited (MORL). Those attending the event could hear about the contracting s

about 12 years ago
Photo of the Day: EnBW Baltic 2 Components Arrive to Sassnitz
Wind Farms

Photo of the Day: EnBW Baltic 2 Components Arrive to Sassnitz

Offshore WIND’s photo of the day: Large component for offshore wind farm EnBW Baltic 2 come in the port of Sassnitz. Located 32 kilometres north of the Baltic Sea island of Rügen, this wind farm will consist of 80 wind power plants with a total output of 288 MW. Baltic 2 will produce enough electric

about 12 years ago
Energinet.dk Selects AC Connection for Kriegers Flak
Wind Farms

Energinet.dk Selects AC Connection for Kriegers Flak

Energinet.dk is preparing for the construction of a traditional grid connection system for the wind turbines at Kriegers Flak. This means that the system is based on AC like the systems connecting Denmark’s existing offshore wind farms with the electricity grid. Originally, the grid connection shoul

about 12 years ago
Energinet.dk Selects AC Connection for Kriegers Flak
Wind Farms

Energinet.dk Selects AC Connection for Kriegers Flak

Energinet.dk is preparing for the construction of a traditional grid connection system for the wind turbines at Kriegers Flak. This means that the system is based on AC like the systems connecting Denmark’s existing offshore wind farms with the electricity grid. Originally, the grid connection shoul

about 12 years ago
Verbrugge Terminals Loads-In First Eneco Luchterduinen Monopile
Wind Farms

Verbrugge Terminals Loads-In First Eneco Luchterduinen Monopile

On Tuesday May 20th, Verbrugge Terminals in the Port of Vlissingen successfully completed the first load-in for the Dutch offshore wind farm ‘Eneco Luchterduinen’. The monopiles are constructed by SIF Group and Smulders Group and are transported to Vlissingen for intermediate storage. In July 2014 t

about 12 years ago
All Turbines Up at Trianel Windpark Borkum’s First Phase
Wind Farms

All Turbines Up at Trianel Windpark Borkum’s First Phase

All 40 wind turbines of the first phase of Trianel Windpark Borkum (formerly known as Borkum West II) offshore wind farm are now installed. MPI Adventure jack-up vessel has been working for eleven months to install forty Areva M5000-116 wind turbines, with a total capacity of 200 MW. “Now, the only

about 12 years ago
All Turbines Up at Trianel Windpark Borkum’s First Phase
Wind Farms

All Turbines Up at Trianel Windpark Borkum’s First Phase

All 40 wind turbines of the first phase of Trianel Windpark Borkum (formerly known as Borkum West II) offshore wind farm are now installed. MPI Adventure jack-up vessel has been working for eleven months to install forty Areva M5000-116 wind turbines, with a total capacity of 200 MW. “Now, the only

about 12 years ago
Application for Offshore Wind Project off Texas Withdrawn
Wind Farms

Application for Offshore Wind Project off Texas Withdrawn

Baryonyx Corporation has withdrawn its permit application from the United States Army Corps of Engineers for an 18 MW Gulf Offshore Wind (GOWind) project off the coast of South Padre Island, Texas. Audubon Texas, an organization for conservation of natural ecosystems, focusing on birds and other wil

about 12 years ago
VSMC Installs More than Half of Dan Tysk’s Inter-Array Cables
Wind Farms

VSMC Installs More than Half of Dan Tysk’s Inter-Array Cables

Last week, Visser & Smit Marine Contracting B.V. (VSMC) laid the last cable in the southern part of the Dan Tysk offshore wind farm site, meaning that half of the 80 wind turbines are ready to be connected to the offshore substation. VSMC’s work on the inter-array cable installation at the offshore

about 12 years ago
Seabed Survey to Commence at Gwynt y Môr OWF
Wind Farms

Seabed Survey to Commence at Gwynt y Môr OWF

Survey vessel RRS Ernest Shackleton will be undertaking seabed investigations at various locations within the Gwynt y Môr Offshore Wind Farm site from May 30. The RRS Ernest Shackleton is joining as an additional vessel to assist in the survey work that started earlier in 2014. The other two vessels

about 12 years ago
Red7Marine Carrying Out Repair and Maintenance Work at London Array
Wind Farms

Red7Marine Carrying Out Repair and Maintenance Work at London Array

Remedial construction works at the London Array Offshore Wind Farm have been launched and will be performed until August 2014. The work is being done at a number of turbines locations. Red7Marine Offshore Ltd is undertaking diving and construction work within the London Array site. Operations will b

about 12 years ago
  • 1
  • …
  • 451
  • 452
  • 453
  • …
  • 508