
Aker Solutions reported an order intake of NOK 12.2 billion in the second quarter of 2021, said to be the strongest in several years, of which about 60% is related to energy transition work. Aker Solutions saw its orderbook go up almost 30% in Q2 2021 compared to the same period last year, equaling

Athens-based containership owner and operator Danaos Corporation has entered into an agreement to acquire six 5,466 TEU container vessels built at Hanjin Subic Bay shipyard.

CO2 separation tech provider Carbon Clean has been awarded the contract to carry out the front-end engineering design (FEED) services for the Acorn carbon capture plant at St Fergus.

Seaspan Corporation, a subsidiary of Atlas Corp., has raised $750 million in senior unsecured notes in the U.S., to help fund projects that “would reduce the environmental impact of its fleet.”

Japan’s FPSO provider MODEC and Toyo Engineering Corporation are entering into talks to study an alliance for FPSO vessels.

Brazilian oil and gas company PetroRio has concluded the tieback between the Polvo and Tubarão Martelo fields, making it the first independent company to create a private cluster of mature fields in the Campos Basin region.

In our new premium we reveal what’s behind closed doors of Panama’s success in achieving carbon neutrality by 2030.

Irish transmission system operator (TSO) EirGrid has submitted the planning application for the Celtic Interconnector to An Bord Pleanála. The application includes a full Environmental Impact Assessment Report and Natura Impact Statement, as well as other plans and particulars. An Bord Pleanála will

Malaysian energy giant Petronas has signed a memorandum of understanding (MoU) with Bangladesh to cooperate in the supply of LNG.

Goleniów-Lwówek pipeline, the longest element of the Baltic Pipe project in Poland, has entered the advanced stage with welding and backfilling in trenches underway. The Goleniów-Lwówek gas pipeline will enable the distribution of gas supplied from the Norwegian Shelf via the offshore gas pipeline i

Subsea 7 has secured an engineering, procurement, construction, and installation (EPCI) contract with an undisclosed client in the Middle East.

Chevron Australia has awarded Ventia a ten-year maintenance contract for works on the Gorgon LNG facility.

A new method to install offshore wind turbines is said to cut installation time by 89 per cent, minimise noise pollution and vibrations, and significantly lower the installation costs.

This spring, Jan De Nul’s trailing suction hopper dredger (TSHD) Pedro Álvares Cabral, sailing on 100% second-generation biofuel, successfully restored the beach of Knokke. In order to protect the Belgian coast, JDN raised the beach by pumping ashore a large quantity of sand. In this way, the compan