
Ariadne Interconnection, a subsidiary of Greek transmission system operator (TSO) Independent Power Transmission Operator (IPTO or ADMIE), has completed the site acceptance test (SAT) for the cable system for what it says is the largest electricity transmission project in Greece. IPTO reported today

SSEN Transmission has entered into a capacity reservation agreement (CRA) with a consortium of Sumitomo Electric Industries and Van Oord for the supply and installation of a second 525 kV HVDC cable link between Shetland and the Scottish mainland, known as the Shetland 2 HVDC Link. The cable for the