European Commission’s funding programme Horizon 2020 has launched a funding call aimed at scaling up the ocean energy sector to arrays in order to achieve energy cost reduction.
Sandia National Laboratories has completed the testing of its advanced wave energy converter (WEC) system for the US Department of Energy (DOE) Wind and Water Power Technology Office.
Research released today shows overwhelming backing for the Swansea Bay Tidal Lagoon among Conservative MPs and Councillors, with more than four in five saying they support the project.
New phase of the Advanced Coatings for Offshore Renewable Energy (ACORN) project, involving the testing of materials coated with ACORN solutions in open water, has started.
Tidal Energy Today has compiled the top news from tidal and wave energy industry from May 9 – 15, 2016.
Mocean Energy, one of the alternate teams to 9 Wave Energy Prize challenge finalists, is moving forward with the design of their 1:20 scale wave energy converter (WEC).
The French Minister of Ecology, Sustainable Development and Energy Ségolène Royal has officially inaugurated DCNS/OpenHydro tidal turbine in Brest.
Nova Scotia Energy Minister, Michel Samson, shares his views on the opportunities the emerging tidal energy sector is offering.
Orkney-based Scotrenewables Tidal Power has launched its 2 MW SR2000, the world’s largest energy generating tidal turbine.
German wave energy company SINN Power has started the long-term trials of its wave energy converter module installed in Crete, Greece.
France-based company DCNS has filed a permit application to construct tidal turbines assembly plant in Cherbourg, Normandy.
The 100 kW Nova M100 device has passed an extensive series of commissioning tests, and is now fully operational.
Carbon Trust has presented the case study for the Array Technology Innovation Programme (ATIP) aimed at achieving cost and risk reduction associated with marine energy arrays.
BioPower Systems (BPS), an Australian wave energy developer, is preparing its bioWAVE wave energy device for commissioning expected to take place during the second half of 2016.