
Polish energy company PKN Orlen has submitted an environmental report for its offshore wind project in the Baltic Sea. PKN Orlen, through its subsidiary Baltic Power, holds a license to build wind farms in the Polish Baltic Sea with a maximum total capacity of up to 1,200 MW. The proposed area cover

Spanish energy company Iberdrola is finalizing the selection of the main contractors for the Baltic Eagle and Wikinger Süd offshore wind projects in the German Baltic Sea. The 476 MW Baltic Eagle and the 10 MW Wikinger Süd were selected in the second public tender organised by Germany’s Federal Netw

New Jersey will seek to procure between 1,200 MW and 2,400 MW of capacity in its second offshore wind solicitation, expected to be issued in September. The New Jersey Board of Public Utilities (NJBPU) has also reserved the right to select less than 1,200 MW or more than 2,400 MW, if circumstances wa

Siemens Gamesa has secured a contract to provide wind turbines and long-term operation and maintenance services for the 78 MW Hiep Thanh nearshore wind farm in Vietnam. The Hiep Thanh wind farm will be located between one and three kilometres off the coast of Tra Vinh Province. The wind farm will fe

Germany’s Federal Ministry for Economic Affairs and Energy (BMWi) has once again issued a tender for an operator of the FINO2 research platform. BMWi had issued a similar tender back in March which was cancelled in June after none of the offers received met the required conditions. The ministry now

Hit by the Covid-19 downturn, the oilfield service market is not likely to rebound to last year’s activity level until 2023, according to a Rystad Energy analysis.

Copenhagen Infrastructure Partners (CIP) and Vietnamese companies Asiapetro and Novasia Energy have signed a Memorandum of Understanding (MOU) with Binh Thuan People’s Committee for the development of a 3.5 GW offshore wind project off the coast of the Binh Thuan province in Vietnam. The project, ca

The consortium behind the 700 MW Akita Yurihonjo wind farm is moving forward with the project after the proposed construction area was designated a ”promotion zone” by the Japanese government. Earlier this month, Japan’s Ministry of Economy, Trade and Industry (METI), and the Ministry of Land, Infra

Japanese government is drafting a bill that would facilitate identifying new development sites for 1 GW of installed offshore wind capacity per year from 2021 to 2031. “Japan is set to draft new rules and support framework in a drive that points to construct offshore wind projects at 30 locales by t

Site investigation work at East Anglia Hub is expected to start in July, according to Iberdrola, the parent company of ScottishPower Renewables, which will build the 3.1 GW project in the UK. The site investigation operations will mark the first deployment of personnel and contractors on the project

The global pipeline of offshore wind energy projects which are operational, under construction, consented, or being planned has grown by 37 GW in the last twelve months, new research published by RenewableUK shows. This is an annual increase of 30%, from 122 GW twelve months ago to 159 GW now, Renew

The first batch of pin piles for the Formosa 2 jacket foundations have been offloaded at the Port of Taichung and are now waiting for installation, which is about to start soon. Each of the pin piles – produced by EEW Korea, EEW KHPC and EEW Malaysia – is up to 78.9 metres long, has […]

Two UK energy technology and innovation organisations have announced a five-year collaboration to deliver next generation energy technologies and accelerate the United Kingdom’s transition to a net zero future. The Energy Transition Alliance (ETA), formed by The Oil & Gas Technology Centre (OGTC) an

The State of New York has announced its second offshore wind solicitation, seeking up to 2,500 MW of projects. The solicitation includes a multi-port strategy and requirement for offshore wind generators to partner with any of the eleven prequalified New York ports to stage, construct, manufacture k