Offshore Energy
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
  • More news
JobsNewsletter
Offshore Energy logo

Your trusted source for global offshore energy news, part of the Navingo network.

Topics
  • Fossil Energy
  • Subsea
  • Alternative Fuels
  • Hydrogen
  • Marine Energy
Network
  • Offshore Energy
  • Offshore Wind
  • NavalToday
  • Dredging Today
Company
  • Advertising
  • Newsletter
  • Jobs
  • Report your news
  • Privacy

© 2026 Navingo. All rights reserved.

Offshore Wind

Loading filters...
CablingGridSubseaWind FarmsProject & TendersAuthorities & GovernmentBusiness Developments & ProjectsBusiness & FinanceTurbinesTechnologyFoundationsVesselsOperations & Maintenance
Ørsted-Contracts-LOC-for-Greater-Changhua-Work
Offshore Wind

Ørsted contracts LOC for work on Greater Changhua offshore wind project

LOC Group has secured a contract with Ørsted to provide marine warranty survey services (MWS) for the Greater Changhua 1 & 2a offshore wind farms in Taiwan. Under the agreement, LOC will provide MWS services for the transportation and installation of the inter-array and export cables. Technical docu

about 6 years ago
Ireland-Speeds-Up-Seven-Offshore-Wind-Projects
Offshore Wind

Ireland speeds up seven offshore wind projects

The Irish government has designated seven offshore wind projects as relevant, meaning they will be fast-tracked through the new marine planning regime. The selected projects include the Oriel, innogy’s Bray and Kish Banks, Codling I and II, Skerd Rocks and North Irish Sea Array (NISA) wind farms. Th

about 6 years ago
A photo of Siemens Gamesa turbines at sea, selected for the Formosa 2 project in Taiwan
Offshore Wind

Stonepeak enters mezzanine debt with AMP to back Taiwan offshore wind investment

New York-based Stonepeak Infrastructure Partners has entered a USD 145 million mezzanine debt agreement with AMP Capital to support the acquisition of Swancor Renewable Energy and the construction of the Formosa 2 offshore wind farm in Taiwan. “The transaction represents our first infrastructure deb

about 6 years ago
Third WindFloat Atlantic turbine being towed to site
Offshore Wind

Final WindFloat Atlantic turbine ready to go home

The last of the three floating wind turbines for the WindFloat Atlantic project will soon set sail from Spain to its designated location off Portugal. Tractebel Engie reported on 17 May that it fully assembled the third WindFloat Atlantic platform in the port of Ferrol. The turbine should start its

about 6 years ago
Copenhagen-Offshore-Partners-Comes-to-Vietnam
Offshore Wind

Copenhagen Offshore Partners comes to Vietnam

Denmark-headquartered Copenhagen Offshore Partners (COP) has opened a new office in Hanoi, Vietnam. The office, opened in April, is located within the French Quarters, close to key government ministries, embassies and the national grid operator, COP said. The first two Vietnamese employees joining t

about 6 years ago
A photo of an offshore wind farm on a calm day at sea
Offshore Wind

Romania: Hidroelectrica reveals 300–500 MW offshore wind farm plan

Romania’s power producer Hidroelectrica has outlined plans for what could be the country’s first offshore wind farm, and the first project of its kind to be installed in the Black Sea. The offshore wind farm, planned to be built by 2026, will have a capacity of between 300 MW and 500 MW, subject to

about 6 years ago
Siemens Gamesa cranks it up to 15 MW with offshore behemoth
Offshore Wind

Siemens Gamesa cranks it up to 15 MW with offshore behemoth

Siemens Gamesa has launched a new SG 14-222 DD offshore Direct Drive wind turbine. The new turbine model has a 14 MW capacity, reaching up to 15 MW using the company’s Power Boost function, a 222-metre diameter rotor, 108-metre long blades, and a 39,000 m2 swept area. The turbine prototype is expect

about 6 years ago
Neart-na-Gaoithe-Soon-to-Continue-Construction-After-COVID-19-Pause
Offshore Wind

Neart na Gaoithe offshore wind farm soon to continue construction after COVID-19 pause

Construction of the Neart na Gaoithe (NnG) offshore wind farm in Scotland is planned to begin this week after a pause due to the coronavirus pandemic. According to Matthias Haag, NnG Project Director, construction of the project was paused in March and is now expected to continue after the latest go

about 6 years ago
Final Trianel Windpark Borkum II wind turbine standing installed at sea, with Blue Tern vessel next to it
Offshore Wind

Trianel Windpark Borkum II in full array

The 32nd and final wind turbine at the Trianel Windpark Borkum II (TWBII) site was installed on Sunday, 17 May. “The last big components were installed Saturday, and final bolt and nut Sunday early morning”, Fred. Olsen Windcarrier informed on 18 May. Fred. Olsen Windcarrier was contracted in Februa

about 6 years ago
Seaway Strashnov on Triton Knoll
Offshore Wind

Five injured in accident onboard Seaway Strashnov

Five people were injured in an accident onboard the installation vessel Seaway Strashnov during the installation of foundations at the Triton Knoll offshore wind farm. The accident occurred overnight on 8 May, a spokesperson for the Triton Knoll project said. All of the five injured persons were air

about 6 years ago
Haizea wind turbine tower being loaded onto Rotra Mare vessel
Offshore Wind

Haizea Wind delivers its first batch of Borssele 1+2 towers

Haizea Wind Group has delivered the first batch of wind turbine towers produced at its facility in Spain for the Dutch Borssele 1+2 offshore wind farm. The company dispatched the tower sections from Bilbao around 13 May. The first shipment contained three bottom sections, three middle sections and t

about 6 years ago
LOC-Provides-Design-for-New-Woen-Jinn-Cable-Laying-Vessel
Offshore Wind

LOC provides design for new Woen Jinn cable-laying vessel

Longitude Engineering, part of LOC Group, has provided the concept and basic design services for Woen Jinn Harbor Engineering’s new DP2 cable-laying vessel that will service the Taiwanese offshore wind market. Longitude Engineering also provided construction specifications for yard engagement and pr

about 6 years ago
Bokalift 2 conversion starts in Dubai
Offshore Wind

Bokalift 2 conversion starts in Dubai

Dubai-based Drydocks World has held a steel-cutting ceremony to mark the start of production on the Bokalift 2 conversion project for Boskalis B.V. Drydocks World will convert a drillship YAN into the offshore installation vessel Bokalift 2. This vessel is designed to carry out offshore operations f

about 6 years ago
NGI monitoring kit for Kriegers Flak foundations
Offshore Wind

NGI monitoring kit for Kriegers Flak foundations

Norwegian Geotechnical Institute (NGI) has won the contract for a structural measurement campaign at Vattenfall’s Kriegers Flak offshore wind farm. The scope of the contract covers the design, production, and installation of instrumentation on two offshore wind turbines which will monitor the monopi

about 6 years ago
  • 1
  • …
  • 324
  • 325
  • 326
  • …
  • 2152