
Spain’s BlueNewables has installed its Paiporta floating solar platform at the Port of Valencia, marking the first major offshore operation of the RENMARINAS project. BlueNewables led the entire engineering scope and EPCI management, including conceptual, basic and detailed engineering; procurement,

Following the completion of pre-engineering studies (pre-FEED), the BarMar hydrogen pipeline project, which will connect Spain and France, is entering the front-end engineering design (FEED) phase, set to confirm the technical viability and final design of the subsea infrastructure. BarMar is a 400-