Irish tidal energy developer GKinetic Energy has completed a new round of testing on its optimized 1:10 scale tidal device at the Limerick Docks testing facility in Ireland.
The Ocean City team members participated in a pre-construction meeting last week to go over plans for an $11.5 million project to rebuild beaches at the northern end of the island, Mayor Jay Gillian said in its latest announcement. The work will add at least 930,000 cubic yards of sand between Seasp
International Energy Agency (IEA) has released its medium-term renewables market report which predicts 43% increase in renewable energy capacity in the next five years.
The French port of Brest has begun upgrading its quay areas to better serve the needs of the marine renewable energy industry.
Offshore Energy Research Association of Nova Scotia (OERA) has issued a request for proposals to determine if there is a practical business case for establishing and operating a small-scale tidal test facility in Nova Scotia.
Damen Shipyards Group has signed a contract with LLC Onego Shipyard to build a trailing suction hopper dredger (TSHD) 2000. The vessel will be built by order of FSUE Rosmorport in Petrozavodsk (the Russian Federation) and will be the sixth dredger built under the design of the Dutch company Damen. C
Wave Hub is looking to expand its team with new job openings for Research and Business Development Manager, and Electrical Development Engineer.
The Marine Offshore Renewable Energy (MORE) team from the University of Algarve has redeployed the Evopod E1 tidal energy device off Portugal.
Bardot Group has appointed Xavier de Lastic to the position of Head of Financial Engineering for large projects.
The dual-fuel trailing suction hopper dredger Scheldt River recently returned from successful sea trials, during which it sailed on LNG and its dredging equipment was extensively tested. The 8,400m³ TSHD, the second dredger in the DEME fleet equipped with dual-fuel engines, was officially handed ove
Tidal Transit’s crew transfer vessels (CTVs) Eden Rose and Tia Elizabeth are the first two in the company’s fleet to be fitted with Marfle data collectors, after the UK CTV operator signed an agreement with the marine fleet productivity specialists Marfle.
The Egyptian Suez Canal Authority (SCA) has signed a contract with Royal IHC for the design and construction of two custom-built 29,190kW heavy-duty rock cutter suction dredgers (CSDs). The vessels will have an overall length of 147.4 meters and provide a maximum dredging depth of 35 meters. In addi
The MET-CERTIFIED project has organized a workshop on marine energy certification and standardization as a side event of the upcoming Ocean Energy Europe Conference & Exhibition.
The OceaNET project has come to an end having trained 13 young researchers in the areas of floating offshore wind and wave energies to support the emerging marine renewable energy sector.