Construction of the two 100m dual-fuel ferries for the Clyde and Hebrides network kicked off with the cutting of the first steel at Ferguson Marine Engineering (FMEL).
The UK’s largest LNG terminal, South Hook, located on the shores of the Milford Haven waterway is scheduled to receive a cargo next week.
Belgium’s Zeebrugge liquefied natural gas terminal is scheduled to receive a cargo of the chilled fuel on March 6.
The FSRU Independence, serving as Lithuania’s LNG import terminal, has on Tuesday received a cargo of liquefied natural gas from Statoil’s Hammerfest facility on Melkoya island.
Barakah Offshore Petroleum informed on Tuesday that its subsidiary PBJV Group won a subcontract for offshore works on Petronas’ first floating LNG facility, the PFLNG1.
BSE Maritime Solutions, an Australian ship repair specialist, has completed repairs of the cutter suction dredger WOMBAT. The WOMBAT entered BSE Brisbane Slipways in mid-January and just after few weeks of work, this Hall Contracting’s 63 meter cutter suction dredger is now ready for the new challen
Höegh LNG on Tuesday informed it has made a decision to put all FLNG activities on hold and focus its resources and capital into the FSRU business.
The 148,000 cbm LNG tanker Arctic Lady is on its way to Dubai with a cargo loaded at Statoil’s Hammerfest facility on Melkoya island.
Vopak’s liquefied petroleum gas facility at the Banyan terminal on Jurong Island received its first cargo to start-up the first independent LPG import and storage facility in Southeast Asia.
A delegation from the U.S. Army Corps of Engineers Charleston District’s operations division toured the USACE dredge Wheeler last week. The Wheeler, based out of the U.S. Army Corps of Engineers, New Orleans District, is in Charleston for repairs. This hopper dredge is scheduled to be operational in
India’s ministry of environment, forest and climate change recently granted the environmental and coastal regulation zone (CRZ) clearance for the proposed Kakinada FSRU project.
The UK’s South Hook LNG terminal is scheduled to receive its sixth cargo of chilled gas for the month of February.
New Orleans-based Harvey Gulf has opened what it claims to be the first marine LNG fueling terminal in North America. Harvey Gulf said Thursday it completed LNG bunkering of its LNG-powered OSV Harvey Energy from the newly constructed fueling terminal at its operation base in Port Fourchon, Louisian
Cutting of the first steel plate for the new 3.500 m3 trailing suction hopper dredger “Minerva” for DEME took place at MTG Dolphin in Varna, Bulgaria on February 4, 2016. The dredger will be built again in cooperation with Royal IHC, the company specialized in construction of efficient dredging and